Contract CPM scheduling and schedule management in Oracle Primavera P6, for owners, contractors, and project teams that need a defensible schedule without a full-time scheduler.
A schedule you can run the project on, and defend.
Many contracts require a Primavera P6 CPM schedule, and many disputes are won or lost on one. We build, maintain, and analyze P6 schedules so your project has a baseline you can manage to and a record you can stand behind.
Whether you need a schedule built from scratch, kept current with monthly updates, or an independent review of someone else's, we bring the P6 expertise on a contract basis, without adding a full-time scheduler to your payroll.

What scheduling covers.
Baseline schedule developmentBuilding the CPM baseline from the contract scope, logic, and durations.
Schedule updates & maintenanceMonthly or periodic updates that keep the schedule current and accurate.
Progress trackingMeasuring actual progress against the plan, with clear status reporting.
Delay & time-impact analysisDocumenting how delays hit the critical path, to support change orders and claims.
Independent schedule reviewVetting a contractor's or GC's schedule on the owner's behalf.
Recovery schedulingReplanning to pull a slipping project back on track.
Look-ahead schedulingThree and six-week look-aheads the field will actually use.
Resource & cost loadingLoading resources and cost for cash-flow and manpower planning.
Common questions.
What is Primavera P6?
Oracle Primavera P6 is the industry-standard software for critical path method (CPM) scheduling on large construction and industrial projects. It is often required by contract on public work and major private projects.
What is CPM scheduling?
Critical path method (CPM) scheduling maps every activity, its duration, and its logic links to find the longest path through the project, the critical path, which determines the shortest time in which the project can finish. It is the basis of professional construction scheduling.
Do you provide contract scheduling without a full-time hire?
Yes. We provide Primavera P6 scheduling on a contract basis, building and maintaining your schedule or independently reviewing someone else's, without adding a permanent scheduler to your payroll.
Can you help with construction delay claims?
Yes. We perform time-impact and delay analysis in Primavera P6 to document how a delay affected the critical path. That record supports change orders and claims and helps protect your position in a dispute.